INNOVATIVE BIOMED SOLUTIONS

LTV 10K PREVENTATIVE
MAINTENANCE

The manufacturer requires 10K preventative maintenance (PM), which needs to be completed every two (2) years or 10,000 hours. An annual PM consists of the following:

  • A thorough cleaning
  • Internal and external filter change
  • Replacement of the internal battery
  • Power board
  • Tubing
  • Pigtail
  • O2 blender
  • Internal pads replaced if necessary

PERCUSSONAIRE IPV ANNUAL PREVENTIVE MAINTENANCE (PM)

An annual PM consists of the following:

  • A thorough cleaning
  • Filter change
  • Functional evaluation
  • Critical internal/minor parts replaced as needed
  • Factory calibration and functional evaluation
  • Cleaning time is limited to 1 hour. Additional cleaning
  • Time will be billed at an hourly rate.
  • Physically damaged parts and/or major line item parts will be quoted in addition to the cost of the PM

PERCUSSIONAIRE IPV 3-YEAR OVERHAUL / REMANUFACTURE MAINTENANCE

A 3-year overhaul/remanufacture consists of the following:

  • A thorough cleaning
  • Aeplacing all elastomeric, sleeves and diaphragms
  • Inspection of all components
  • Factory calibration and functional evaluation
    As a Distributor for Percussionaire®, it is Pulmonair’s responsibility to
    ensure all Percussionaire® Medical Devices are serviced in a timely
    and ecient manner to provide our patients with the utmost care. In
    addition, according to the FDA regulations all devices are to be
    serviced, repaired, and tested by a Certified Percussionaire®
    Biomedical Technician in order for patient use

10KHR/2YR
TRILOGY

Services performed:

  • A thorough cleaning
  • Replace inlet filter
  • Perform complete visual inspection
  • Update firmware to latest Rev as
    needed
  • Perform complete computer-based
    testing and calibration verification

7.5KHR TRILOGY

Services performed:

  • A thorough cleaning
    Replace Turbine Assy
  • Replace inlet filter
  • Perform complete visual inspection
  • Perform complete internal updates per
    the manufacturer’s protocol
  • Update firmware to latest Rev as needed
  • Perform computer calibration
  • Perform complete computer-based
    testing

VIVO 50 - 1-YEAR MAINTENANCE

Services performed:

  • A thorough cleaning
  • Perform external inspection
  • Replace the cooling air filter
  • Perform a complete computer based function check and
  • Calibration verification

VIVO 50 – 3-YEAR MAINTENANCE

Services performed:

 

  • A thorough cleaning
    Replace internal batteries
  • Replace power failure alarm
  • Perform external inspection
  • Replace the cooling air filter
  • Perform a complete computer based function check and
    calibration verification

VIVO 50 – 5-YEAR MAINTENANCE

Services performed:

  • A thorough cleaning
  • Replace clock battery
  • Replace Alarm batteries
    Perform complete internal
  • Inspection
  • Perform external inspection
  • Replace the cooling air filter
  • Perform a complete computer based function check and calibration verification

VIVO 50 - 20KHR

Services performed:

  • A thorough cleaning
  • Replace blower assembly
  • Perform complete internal
  • Inspection
  • Perform external inspection
  • Replace the cooling air filter
  • Perform a complete computer based function check and
    calibration verification

LTV 30K PREVENTATIVE MAINTENANCE

The manufacturer requires 30K preventative maintenance (PM), which needs to be completed every six (6) years or 30,000 hours. The 30K PM consists of the following:

  • A thorough cleaning
  • Internal and external filter change
  • Replacement of internal battery
  • Turbine manifold
  • Tubing
  • Fan assembly
  • Pigtail
  • Rotary switch
  • O2 blender
  • Memory board
  • Solenoid manifold
  • Power board
  • Flow valve
  • Internal pads replaced if necessary
EnglishenEnglishEnglish

Ready to experience
The Patriot™?

Leave your contact information and we’ll reach out with tailored guidance for your home and lifestyle

Please do not submit any Protected Health Information (PHI).